Metro Project – Line AMonorail Project
About Qom Urban Railway Organization
Qom Urban Railway Organization was established in 2008 with the aim of managing urban railway projects of Qom and it has benefited from efforts of city officials since it`s start. This organization has excelled in urban railway projects including metro-line A and the monorail by managing resources and eliminating obstacles successfully until now.
Qom is the eighth among Iranian cites in terms of its population. it is also the second most eminent Pilgrimage destination in Iran after Mashhad .Moreover the city is the most significant center of religious scholarship and attracts students and scholars from inside and outside the country.
Qom is located at a critical junction of different areas of Iran. It connects northern and southern provinces. It is also a connecting point between the southwestern and central areas of Iran. In addition, this city hosts millions of pilgrims and tourists from all over the world and Iran yearly. These factors make Qom`s traffic and transportation planning very important.
MAP OF URBAN RAILWAYS OF QOM
Findings and consequences of Qom comprehensive traffic studies cause to determine amount of trip request, lines specifications and places of stations, following a combinatorial corridor contains metro-line A and monorail have been selected that they are being constructed at now.
According to these traffic studies, five corridors of the urban railways have been determined for Qom, two of them have superior traffic council enactment including metro-line A and the monorail. These corridors cover different areas of Qom as following:
Metro line A project
Metro-line A is 14.8 KLM in length, It starts from northwest of Qom in Ghale Kamkar area and continues toward the holy shrine and the central areas, and finally ends at Qom southeast in the holy mosque of Jamkaran.
This line has 14 stations which have been named from A1 to A14 respectively. Passenger platforms are placed at both sides of the line. the average length of each station is 109 meters and the average space between per station is 1 KLM.
The primary station of this line is located near Jamkaran mosque and it`s depot is placed in Ghale Kamkar. The depot is located at the end of the corridor and it`s extent is 37 Hectare, Repair and maintenance operations for train wagons are done there.
Qom metro tunnel excavation is done In two ways:1- Traditional Excavation 2- Mechanized Excavation. About 10.3 KLM of entire route length is excavated by EPB-TBM machine (from Ghale Gamkar area to Valiasr square) and about 4 KLM of the route is excavated traditionally and 500 m of the end of route is done openly. Metro First operation Phase contains 6 staions from A9(Motahari square) to A14(Ghale Kamkar) approximately 5 KLM in length.
Metro Line A Specifications and stations:
Monorail Project
The first monorail corridor of Iran is being constructed in Qom. This project started in 2009 with the aim of developing Qom public transportation. It connects north of Qom to it`s south. this corridor has a crossroad with the metro project in Motahari square . The entire authorized track of the monorail is 18 KLM with two executive phases, the length of the first phase is 6.8 KLM with 8 stations and another phase has not been started yet. In order to supply required electricity power for monorail cars, a 63/20 KV substation with 1760 m2 of extent has been constructed beside this project in Navvab street. Because of space limitation this substation has been selected GIS type. This post has more than 95 percent progress at present. It is ready to operate for the monorail power supplement and also the metro power supplement.
Monorail Specifications and stations:
The first operational phase of monorail:
The first operational phase of monorail contains a route with 4.7 KLM in length with 6 stations (from Payane to Motahari) which is currently under construction. All stations are 81 meters in length and 21 meters in width. In addition, they have been constructed in 2 floors with a 3500 area.
Each station has a technical and administrative room in the first floor and passenger train boarding platform is located in the second floor. At the second floor there are places for passenger sitting , an escalator, an elevator and an emergency telephone on both sides.
-----------------------------------------------------------------------------------------------------------------------
Public Relations of Qom Urban Railway Organization
phone number: +98-25-36652662 +98-25-36650308
Fax: +98-25-36653045
Postal code: 3718163313
وزیر کشور در بازدید از خط ۲ مترو کرج سیستم حمل و نقل ریلی را ارزانترین، ایمنترین و پاکترین سیستم حمل و نقل عمومی دانست و آن را اولویت دارترین بخش این حوزه عنوان کرد.
مدیر عامل سازمان حمل و نقل ریلی شهرداری قم، بصورت سرزده از فعالیت های در حال انجام فاز دوم خط یک مترو قم بازدید و در جریان پیشرفتها و مشکلات پیش رو قرار گرفت.
در نشست بررسی مسائل خط ۲ مترو قم با هدف کاهش بار ترافیکی محورهای شمال، جنوب و مرکزی شهر، بر ضرورت شتاببخشی به تکمیل فازهای نخست و آغاز به موقع این خط تأکید شد.
رئیس کمیسیون عمران و حملونقل شورای اسلامی شهر قم به همراه مدیرعامل سازمان حملونقل ریلی شهرداری قم، از غرفههای نمایشگاه بینالمللی حملونقل بازدید و با آخرین دستاوردها، فناوریها و نوآوریهای حوزه حملونقل عمومی آشنا شدند.
معاون هماهنگی امور عمرانی استانداری قم گفت: خط یک متروی قم به طول 14.8 کیلومتر قلعه کامکار را به جمکران وصل میکند که اکنون بخش نخست این خط از قلعه کامکار تا میدان مطهری آماده بهرهبرداری و منتظر واگن است و خط دوم مترو از پایانه مسافربری قم تا منطقه پردیسان و فرودگاه درنظر گرفتهشده است.
شهردار قم با صدور پیامی فرا رسیدن روز کارمند را به کلیه کارمندان شاغل در شهرداری، ستاد، مناطق و سازمانهای تابعه تبریک گفت.
مدیرکل اتباع و مهاجرین خارجی و رئیس اداره مهاجرت و گذرنامه امروز در جریان مسائل و پیشرفتهای پروژه مترو قم قرار گرفتند.
رئیس کمیسیون عمران و حمل و نقل شورای اسلامی شهر قم ضمن تقدیر از پیگیری مدیریت شهری و سازمان حمل و نقل ریلی در رفع مشکلات تامین واگن گفت: مشکلات تأمین واگن از طریق همکاری وزارت کشور و شرکت تأمینکننده چینی حل شده و شهرداری قم تنها موظف به پرداخت مابهالتفاوت نرخ ارز است.
مدیرعامل سازمان قطار شهری قم با بیان اینکه پروژه مترو قم در حال حاضر بهصورت سه شیفت در حال احداث است، از کاهش چشمگیر هزینهها و صرفهجویی حدود ۵۰۰ تا ۶۰۰ میلیارد تومانی در اجرای فاز دوم خط نخست خبر داد.
مدیرعامل سازمان حملونقل ریلی قم شهرداری قم از پیشرفت ۹۷ درصدی فاز نخست متروی قم خبر داد و گفت: تا بهمن سال جاری واگنها باید تحویل و تست گرم آغاز شود.